Most installers start with a template someone else used, then patch it after a claim goes wrong. A template does two jobs: it satisfies the regulator, and it prompts the crew to capture the right details at the right time. We cover the formal requirements in STC assignment form requirements, and our assignment form guide goes through the form line by line.
Core fields
- Owner’s full name, contact details and ABN if applicable.
- Installation address, matching the registry exactly.
- System type and size, with brand, model and serial numbers.
- Installation date and installer details, including accreditation numbers.
- A clear statement that the owner assigns the right to create STCs.
- The value or discount passed on to the owner.
- The owner’s signature and the date.
Product-specific sections
Solar needs panel and inverter details and the system capacity. Batteries need usable capacity, model and serial numbers, and the VPP capability declaration. Hot water needs the installation type and the replaced system. See our pages for solar, battery and heat pump forms.
Design choices that prevent errors
- Required fields are obvious, and forms with blanks are refused.
- Fields are pre-filled from the quote so the owner only confirms.
- The form is generated from the same data you use for the claim, so addresses and serials match.
- A digital version carries a timestamp.
- Copies are kept with the job file.
Version control
When the regulator updates its guidance, templates change with it. A version number and date at the bottom of the form, with old versions archived and the version recorded per job, shows exactly what the owner signed if a question arises about a job from two years ago.
Related pages
Installers changing traders or process can see what moves on our switch page, and how it works shows where the form sits. The resources hub has the rest of the paperwork guides.