Today's rateSTC $38.50·VEEC $60.00Rate card

Battery STCs and the Cheaper Home Batteries Program

How do installers prove a battery is VPP capable?

Short answer

VPP capability is established at the product level. The battery and inverter combination has to appear on the Clean Energy Council approved list, with the exact model and serial numbers recorded and the evidence kept the Clean Energy Regulator asks for with the claim. Capability is not self-declared.

Written and checked by the Energy Merchants desk · Reviewed 3 October 2026 · For installers

General information only. Nothing on this page is financial, tax, legal or product advice, and it does not take your circumstances into account. Check the scheme's official rules and speak to a licensed professional before acting.

Installers sometimes treat VPP capability as a box to tick on the job sheet. It is better thought of as a product status you verify rather than a statement you make.

How capability is established

For on-grid systems under the Cheaper Home Batteries Program, a battery system must be able to connect to the grid and outside entities, receive remote signals and respond to them. The Clean Energy Council runs the approved products list, and the program’s eligibility sits on top of that list. The practical test for an installer is: is this exact battery and inverter combination listed as approved, and does the listing indicate it meets the program requirements? If yes, the product is the evidence. If it is not listed, the install is not expected to earn STCs.

What to record on each job

  • Battery make, model and the exact configuration (including any inverter paired with it).
  • Serial numbers, photographed legibly on the unit label.
  • The date of installation and your accreditation number.
  • A screenshot or note of the listing status on the day, which is helpful if the list is later updated.
  • Any commissioning record showing the battery connected and communicating, where that is part of your process.

The photo rules were tightened from 1 March 2026, so follow the battery photo guide and the battery submission guide.

Which batteries are VPP capable?

There is no short list worth memorising, because the list changes as products are added and removed. Most mainstream home batteries sold in Australia have been through the approval process, but approval is per model. A battery that qualifies in one capacity may not in another, and a product can be approved only when paired with specific inverters. The model is checked against the CEC list: how to check the list.

Operator compatibility is a separate check

Program capability does not guarantee that a particular VPP operator will accept the battery. A customer who wants to join a VPP will find each operator publishes its own compatible product list.

Where installers stand

The listing is checked when the battery is ordered and again on installation day, with the evidence filed. When installers lodge through us, the compliance desk pre-checks the claim, photos and serials, so a product mismatch is caught before it costs you days. See the pillar page, the rate on /pricing/ and /start-trading/ to set up.

Follow-up questions

People also ask

Do I need to prove the customer joined a VPP?
No. The requirement is capability of the product, not membership by the customer.
Is a battery from a major brand automatically VPP capable?
No. Capability is assessed per product and configuration, so the listing for the exact model applies.
What if the listing changes after I order stock?
The claim is assessed against the product's status on the install date.

Got a claim to lodge this week?

Sign up today. Your account manager calls with your rate card and your first claim can be settled within days.

Call the deskStart trading