The check takes a few minutes and is the first compliance step in the job.
Step by step
- Get the exact model from the invoice or datasheet. Not the marketing name. The full model code, including suffixes for capacity, region or inverter pairing.
- Open the Clean Energy Council approved battery list and search by manufacturer, then by model.
- Read the listing, not just the name. Note whether it is a battery alone, a battery with a specified inverter, or an integrated system.
- Match capacity. If the product comes in multiple module counts, confirm the capacity you are installing is the one that is listed and note the usable kWh.
- Record it. Screenshot or save the listing with the date, and file it with the job.
- Check again on the install date. The list changes.
Battery and inverter combinations
Many home batteries need a compatible inverter, either an integrated hybrid inverter or a separate unit. The program looks at the battery system as a whole, and the VPP-capability requirement includes the inverter. If the listing names a specific inverter, that is the pairing that qualifies. A swap to another approved inverter qualifies only if the combination is itself listed.
Firmware
There is no separate “firmware list” to check for the rebate. The practical risk is that a battery may need current firmware or a configured cloud connection to exhibit the VPP capability it is listed for. The manufacturer’s installation and commissioning guide sets the recommended software version, which is noted on the job sheet, and any conditions on the listing apply.
Common traps
- Same brand, different model code (a suffix that denotes another capacity or region).
- A listing that applies to a combination and an installed inverter that is different.
- A product that was on the list when ordered and removed before installation.
- Usable capacity entered from the nominal figure instead of the listed usable one.
What this means for installers
The check is commonly a gate in the job workflow. When claims are lodged with us, the compliance desk pre-checks the product, serials and photos before the claim goes in, and the rate on /pricing/ locks when a complete claim is lodged. Our battery submission guide sets out the full checklist, and /start-trading/ covers the settlement side.
Reading a quote
The same check runs from the model number on a quote. The pillar page and our list explainer cover what qualifies.