Clean Energy Regulator letters take a few forms, and the form shows what the regulator wants.
The kinds of contact
An audit or review letter says certain installations are being checked and asks for supporting evidence. It lists the systems, usually by address or STC reference, and a deadline.
A compliance notice or statutory notice is a formal request to provide information or documents. It cites its basis in the legislation and sets a due date.
An inspection notice relates to a physical visit, covered in the site inspection page.
What they usually ask for
- installation photos that match the photo requirements
- the signed STC assignment form and owner details
- the installer’s accreditation and proof they attended or supervised
- equipment details: panel and inverter models, serial numbers
- the electrical safety documentation, such as certificates of electrical safety or equivalent in your state
- dates for installation, commissioning and connection
What a response contains
- Deadline and scope. Every system and every document requested.
- Job files. Originals, rather than records rebuilt from memory.
- Gaps. Where a photo is missing, the response states what exists and what does not.
- Method. The letter specifies how to reply.
- A copy of what was sent and when.
After you reply
The CER assesses what you provided. Outcomes range from no further action, through requiring corrections or additional evidence, to STCs being marked invalid and, in serious cases, action against the registered person or installer.
What this means for installers
Records made at the time of the job are what an audit examines. Our guide to how STC audits work explains what is checked, and the top rejection reasons show the usual weak points.
For a compliance desk that pre-checks claims before lodgement, see how it works or start trading. For the broader picture, read the STC trading overview.