Submission is the stretch between finishing the install and seeing money. It looks long on paper, but most of it is checking, and most of the delay is avoidable.
Step by step
- Assignment signed. The customer assigns the STC rights. Do this before or at install.
- Install and photograph. Take the full photo set on the day, with serials.
- Assemble the claim. Photos, assignment form, system size, install date, postcode, accreditation details.
- Lodge with your trader. Upload through their portal or form.
- Compliance review. The trader checks the evidence and flags problems.
- Registry creation. Certificates are created and transferred.
- Payment. Released per the trader’s terms.
Where it goes wrong
Mostly steps 2 and 3. A missing photo or a mismatched serial can stall the entire claim. The photo requirements guide and the assignment form guide are checklists for those steps. Our insight on the top rejection reasons lists the others.
Batteries and hot water
Battery STCs have their own evidence set, including rules that tightened from 1 March 2026, and hot water systems have their own photo checklists too. Each job type has its own checklist; see the battery submission guide and the hot water checklist.
What this means for installers
A trader pre-check shortens the loop. Energy Merchants’ compliance desk reviews every claim before lodgement. The how it works page shows our process. See also the STC trading pillar and start trading.
Some installers track each job’s lodgement date, query date and payment date, which shows which step takes the time. Installers running multiple crews often use a single shared lodgement process, with set file naming, photo order and one person who checks the set before it is sent. That structure also makes any audit easier to answer.