Today's rateSTC $38.50·VEEC $60.00Rate card

Compliance, photos, audits and rejections

Is there a same-day limit or distance rule for STC installers?

Short answer

There is no single distance rule, but an accredited installer has to be on site during setup, mid-installation and commissioning. A day that makes that physically impossible, or exceeds accreditation limits on daily installs, invites an audit.

Written and checked by the Energy Merchants desk · Reviewed 3 October 2026 · For installers

General information only. Nothing on this page is financial, tax, legal or product advice, and it does not take your circumstances into account. Check the scheme's official rules and speak to a licensed professional before acting.

Installers search for a “distance rule” because they have heard of crews being questioned about sites that were too far apart on the same day. The honest answer is that the rule is about presence, and distance only matters because it makes presence impossible.

What the rules actually require

The accredited installer who signs the claim has to be physically on site for the key stages: at job setup, partway through the installation and at commissioning. Evidence is a set of time-stamped, geotagged photos, including the installer’s own on-site photo. The Clean Energy Regulator (CER) has taken action against installers who could not show they were there. For detail on the stages see installer attendance requirements.

On top of that, accreditation limits how many installations one installer can be responsible for in a day. At the time of writing that cap is reported as two. The Solar Accreditation Australia (SAA) installer requirements give the current figure.

Why distance becomes the giveaway

The CER and SAA do not need to guess. Photo metadata gives them a timeline per installer. If the same accreditation number appears at a site in Geelong at 9am and one in Ballarat at 9:40am with a third job claimed at lunch, the data tells the story. This is the sort of pattern risk-based audits are built to find. See how the CER chooses jobs to audit.

Handovers and multiple installers

Rules changed to allow more than one installer on a rooftop job where one cannot finish, or the work is handed from one accredited person to another. Where a job is rostered this way:

  • The record shows who covered which stage, with dated photos for each person.
  • Each person is accredited for the system type.
  • A supervising installer who was not there cannot be listed.

A worked example

Take a two-person crew with one accredited installer. On Tuesday they book a 6.6 kW job in the morning and a second job 90 minutes away in the afternoon. The accredited installer needs to be present for setup and mid-installation at both, and to commission both. If the first job runs long, the second job’s setup photos will be taken late or by someone else. The metadata will show it. The two ways this is resolved are a second job on the next day, or a second accredited installer recorded on that job.

Follow-up questions

People also ask

How many installs can one installer sign off in a day?
Solar Accreditation Australia's rules cap the number of installations per installer per day, reported as two. SAA publishes the current requirements.
Can two installers share one job?
The Clean Energy Regulator now allows multiple installers on a single rooftop job under set conditions, such as a handover. Each must meet the attendance and evidence requirements for the stage they cover.

Got a claim to lodge this week?

Sign up today. Your account manager calls with your rate card and your first claim can be settled within days.

Call the deskStart trading