Compliance, photos, audits and rejections

What are the installer attendance requirements for STCs?

Short answer

The accredited installer must carry out the installation or directly supervise it, which means being physically on site for the key stages. A name on a form while the work is done by others is a common reason for STC audit failures.

Written and checked by the Energy Merchants desk · Reviewed 2 October 2026 · For installers

General information only. Nothing on this page is financial, tax, legal or product advice, and it does not take your circumstances into account. Check the scheme's official rules and speak to a licensed professional before acting.

The scheme assumes a qualified person is accountable for the work. That is the point of attendance rules, and they are a favourite check in audits.

What attendance means

The accredited installer is expected to do the work or to directly supervise it, which in practice means being on site for installation, wiring and commissioning. The Clean Energy Council sets the supervision rules for accreditation, and the Clean Energy Regulator looks for compliance when it audits STC claims.

Where crews get caught

  • The accredited installer is booked on several jobs at once, while apprentices or labourers do the work.
  • Photos taken weeks after the job, with the installer standing in front of a finished array.
  • Paperwork signed in the office, with no evidence of attendance on the day.
  • A subcontractor crew under a retailer’s accredited person who never visits.

How to show attendance

  1. Take dated photos during the install, with the accredited installer visible at least once.
  2. Keep the timestamps and location data in the images.
  3. Complete a written statement, see installer written statement.
  4. Keep a job schedule showing who attended.

What happens if attendance fails

The claim can be rejected, or STCs can be invalidated after the event, and the Regulator can act against accreditation.

Scheduling and the supervision rules

Under the supervision rules, an accredited installer is attached to one site at a time for the main work. Short, staggered visits are only possible where the rules allow, and two sites in different suburbs for the same accredited person on the same morning is a pattern auditors look at, because rosters are checked against photo timestamps.

Where installers stand

Attendance evidence is part of every claim. See how STC audits work and the photo requirements for what evidence looks like. Our resources hub and how it works show how we pre-check claims before lodgement.

Follow-up questions

People also ask

Can one accredited installer supervise several sites at once?
Not in a way that leaves sites unattended at the key stages. The Clean Energy Council's supervision rules set out the details.
How do I prove I was there?
Dated photos, timestamps, GPS data on photos where available, and a signed statement.