Hot water and heat pump STCs

How to claim STCs on a heat pump

Short answer

To claim STCs on a heat pump, check the model is eligible, get the owner's signed assignment, install and photograph the job, create the claim in the Clean Energy Regulator registry, then sell the registered certificates to a trader.

Written and checked by the Energy Merchants desk · Reviewed 2 October 2026 · For installers

General information only. Nothing on this page is financial, tax, legal or product advice, and it does not take your circumstances into account. Check the scheme's official rules and speak to a licensed professional before acting.

Claiming STCs on a heat pump follows a fixed order. Doing the steps out of sequence is where time is lost, so the order below applies to every job. For the overview of the category, see heat pump hot water STCs.

1. Check eligibility before you quote

Confirm the exact model and tank size is registered for STC creation. Registered lists change, so the check is made on the installation date.

2. Pick the installation type

New, replacement or additional. This changes the STC count and the evidence required. The installation type guide sets out the rules.

3. Get the assignment signed

Collect the owner’s signed assignment form before or at install. Signatures are not backfilled.

4. Install and photograph

Photograph the installed unit, the data plate with the serial number, the installation location, the installer on site if required, and the removed system if it is a replacement. The hot water and heat pump checklist has the full set.

5. Create the claim

Log into the registry, enter the system details, upload your evidence and submit. The regulator reviews the claim and registers the STCs if it is clean. Timing varies.

6. Sell the certificates

Transfer the registered STCs to your trader and invoice according to their process.

From the desk: a quality check of the photo set before lodging catches blurred data plates that would otherwise cost a resubmission.

Time limits and tracking

Certificates must be created within a set period after installation, so hot water jobs are tracked from install date to lodgement to registration to payment. Tracking shows whether delays sit in the installer’s office, at the regulator or with the trader.

What this means for installers

A tidy process makes heat pump claims predictable. A trader whose compliance desk pre-checks claims, such as Energy Merchants, can catch gaps before the regulator does, and settles on a published schedule. See the hot water STCs pillar, how it works and pricing.

Follow-up questions

People also ask

How long after install can I create the claim?
There is a time limit after installation. The Clean Energy Regulator publishes the current rule.
Who creates the certificates, me or the trader?
Either route is possible. Some traders create on your behalf, others buy registered certificates you have created.
What causes most rejections?
Evidence mismatches: serials, photos and installation type.