Platforms are commonly compared on how much they pay and how little work they need. Here are the six points, set out without a features page.
1. Net rate
The starting point is the amount received per certificate after every deduction. A published daily rate with no fees is the easiest to compare; a headline rate with fees on top needs arithmetic. See aggregator fees.
2. Rate lock
When is the price fixed: at lodgement, validation or payment? A rate locked on a complete claim is fixed while the claim clears. A rate “at time of sale” does not. Ours locks on lodgement of a complete claim.
3. Settlement time
State it in hours or business days, from a named start event. Payment within a day or two compared with 20 or 30 days is a large payment timing difference. See how long aggregators take to pay.
4. Product coverage
- Solar: zone ratings, deeming period, mid-scale from 1 October 2026.
- Batteries: factor, tiers and the evidence checks. See the battery STC trader page and battery STCs.
- Hot water and heat pumps: plumber details and installation type. See hot water STCs.
- VEECs if you work in Victoria. See VEEC trading.
5. Tools: upload, bulk and invoices
Look for bulk upload by spreadsheet, photo checks before lodgement, a status page, and automatic buyer-created invoices. See bulk submission and the buyer-created invoice.
6. Compliance review
Some platforms check photos, forms and serials before lodgement, while others only record failures. See why claims get rejected.
Red flags
Rate “on request” with no written lock, payment waiting on the buyer, unexplained deductions, no named contact, and no CER registered agent status you can verify. Trader contract terms set out these points.
What this means for installers
Energy Merchants is a desk rather than software: a named account manager, a compliance team that pre-checks each claim, 24-hour settlement for established partners and zero fees, backed by RecTraders. See pricing, start trading or the choosing a trader checklist.
Switching provider
A change of provider does not need a single cut-over. Existing jobs can stay with the current provider until their claims clear while new installs go to the new desk. Our switch guide walks through it.