What does power station accreditation cost and how long does it take?

Short answer

The CER charges a power station application fee that starts at about $50 for smaller stations under 10 MW with a default or nil baseline, plus a small per-LGC fee. Timing depends on how complete the application is, and it typically takes weeks rather than days. The CER fees page lists current amounts.

Written and checked by the Energy Merchants desk · Reviewed 3 October 2026 · For installers and homeowners

General information only. Nothing on this page is financial, tax, legal or product advice, and it does not take your circumstances into account. Check the scheme's official rules and speak to a licensed professional before acting.

Two questions get asked together: what does accreditation cost, and how long until I can create LGCs? Both depend on facts the CER publishes and updates, so the CER’s fees page has the current figures.

What the fees look like

At the time of writing, the CER’s published fees for a power station application start at about $50 for stations under 10 MW with a default or nil baseline, and about $150 for those with a special baseline that uses data. There is also a small per-certificate fee when LGCs are created, reported at around 8 cents per LGC. Rooftop and ground-mount solar built after 1997 generally has a nil baseline, so the lower tier is the typical case.

The money cost is small. The larger cost is the time of someone assembling the documents.

How long it takes

The CER does not guarantee a fixed turnaround and processing can vary with workload and application quality. Processing typically takes several weeks, and a complete application is processed faster. Reported CER policy sets the accreditation date as the day an application is properly made or the date the site starts generating, whichever is later, so a missing document can delay when your LGCs start counting.

What an application involves

  1. Ownership details and the nominated person.
  2. A single line diagram and system specifications (panels, inverters, capacity).
  3. Evidence of grid connection approval.
  4. Meter and metering arrangements.
  5. Commissioning date and, if applicable, baseline information.
  6. Equipment details that match what is installed.

Follow-up questions

People also ask

Is there still a reason to accredit a system under 1 MW?
For systems installed from 1 October 2026, the mid-scale STC rule applies. For older systems above 100 kW, accreditation and LGCs remain the route.
What delays an application?
Missing or inconsistent documents: single line diagrams, grid connection approval, ownership evidence, meter details and baseline information.
When does accreditation start counting?
The accreditation date is the date the application is properly made or the date the station starts generating, whichever is later, according to CER policy as reported.