If you want the battery to create STCs, you need to be accredited by Solar Accreditation Australia (SAA) for battery installation, or work under the on-site supervision of someone who is.
The short version
The accreditation does not decide whether a battery can be installed. Your electrical licence and local regulations do that. What accreditation decides is whether the install can earn certificates. Because the discount on a battery job is worth thousands of dollars, an unaccredited install means no certificates and no discount.
Common scenarios
- Licensed electrician, no accreditation. You can do the install, but certificates will not be created unless an accredited installer supervises on site.
- Accredited installer, using a subcontractor. The accredited person must be on site or directly supervising, and the paperwork should say so.
- Accreditation lapsed or suspended. Claims will fail.
- Accredited for solar only. Scope has to cover batteries.
Installers who are not accredited yet
Accreditation requires evidence of training and competency, and it is not instant. In the meantime you can partner with an accredited installer who supervises on site, but the arrangement has to be genuine and documented. Accreditation has to be in place at installation, not at lodgement.
Related pages
Read battery installer accreditation for the background and battery rebate installer requirements for the other conditions. The battery STC pillar covers the program, and the battery submission guide lists the evidence you need. Energy Merchants’ desk pre-checks claims lodged through start trading.